Who we serve

3D Scanning for Public Agencies

A 3D scan gives a public agency a measured record that can do more than serve the current design team — it can survive procurement, satisfy a funding source's documentation standard, and still mean something to whoever manages the building after the project that paid for the scan has closed out. Agencies planning capital work under bond, grant, or general-fund dollars are working against a deliverable standard as much as a building, and the record has to hold up to both.

The problem: a record that has to satisfy more than the design team

Public capital projects answer to more audiences than a private renovation does. The design team needs measured existing conditions to work from, but the funding source — a bond, a grant, a capital budget line — often specifies its own documentation standard, the procurement file needs a deliverable that can be reviewed and archived, and the facilities department that inherits the building needs a record that still makes sense years after the project team has moved on. A drawing set built only for the architect in front of you rarely satisfies all of that at once.

Civic buildings tend to make this harder rather than easier. They are often older than any drawing set on file, renovated in pieces over decades without a full record kept of each change, and in daily public use, which limits when and where a crew can actually work. Capital budgets tied to a bond cycle or a grant deadline add a fixed spending window on top of that, so a field-verification delay costs more than it would on a project with a flexible schedule.

Scanning gives agencies a measured record that can be scoped, from the start, to whatever the funding source's documentation standard or the RFP's deliverable specification actually requires — procured through the same public bid process the agency already uses, produced as a subconsultant to the architect or engineer holding the prime contract where that is how the project is structured, and handed off as a record the facilities department can still use after everyone who worked on the project has left.

How capture is scoped to a public project

Agency work is shaped by the procurement document and by access, more than by the building's size — the sequence below reflects what usually governs the schedule.

Scoped to the deliverable specification

Capture density, modeling depth, drawing content, and file format follow whatever the RFP, the grant, or the bond documentation standard specifies, rather than a default template applied regardless of the funding source.

Security and access-restricted areas

Badging, escorts, and facilities coordination arranged in advance, with any space the agency does not want recorded — an evidence room, a dispatch center, a detention area — stated in the scope and excluded outright rather than discovered on site.

Scheduled around a public calendar

Courtrooms have dockets, council chambers have meeting nights, service counters cannot close for a survey crew — most agency capture happens in the evening, on a weekend, or during a recess, arranged with facilities ahead of the visit.

Built to outlive the project team

Registered to a documented control network and delivered with a coverage report, so a future project team — who may have no relationship with the firm that did the original capture — can still trust and reuse the record.

Deliverables that satisfy a procurement file

The deliverable set follows the funding source and the RFP rather than a default package, since that is what actually gets reviewed and archived.

Deliverables matched to the funding source's standard

Whatever the bond, grant, or capital program specifies for documentation content and format, confirmed before the proposal rather than assumed from the building type.

Existing-conditions CAD or BIM model

Modeled to whatever level of development and system content the procurement's BIM specification calls for, where one is invoked — those choices drive the effort far more than square footage does.

Registered point cloud with a QA report

Documented control, registration residuals, capture date, and a coverage note listing anything excluded from the scope, suited to sitting in a procurement or records file rather than only a design team's project folder.

As-built drawings for facilities and archival records

A drawing set built for the department that maintains the building long after the capital project that paid for it has closed out.

What agencies and their A/E teams ask us

Can you work as a subconsultant under an architect or engineer holding the prime contract?

Yes. A significant share of public work reaches us that way, and we work to the prime's scope, deliverable specification, and schedule rather than proposing our own.

Our RFP specifies a BIM or documentation standard — can you meet it?

Send the specification before asking for a proposal. Public standards vary widely in what they actually require — level of development, which systems get modeled, naming conventions, what has to accompany the model — and those choices affect the effort far more than the building's size does.

What about spaces we can't let you record?

State them in the scope and they're excluded, with the exclusion written into the coverage report so nobody downstream mistakes a restricted area for something that was simply missed. Detention space, evidence storage, and operations centers are common examples.

What does onboarding with an agency usually involve?

Typically a certificate of insurance, a completed vendor prequalification questionnaire, and whatever safety or training documentation your procurement process requires for site access — the same paperwork any vendor working on agency property provides.

Your next decision

Make the invisible
measurable.

Tell us what is inside, outside, and on the line. We will help you scope the capture and the handoff — in New York, New Jersey, or Connecticut.

Request a scan quote